Authentic Nutanix NCSE-Core Exam Dumps PDF - Jan-2025 Updated [Q115-Q130]

Share

Authentic Nutanix NCSE-Core Exam Dumps PDF - Jan-2025 Updated

NCSE-Core Dumps Special Discount for limited time Try FOR FREE


The NCSE-Core certification exam is a multiple-choice exam that is designed to test the candidate's understanding of Nutanix technology and its various components. NCSE-Core exam consists of 60 questions that must be completed within 90 minutes. NCSE-Core exam is computer-based and can be taken at any Pearson VUE testing center worldwide.


To achieve the NCSE-Core certification, candidates must pass a 2-hour exam consisting of 50 multiple-choice questions. NCSE-Core exam is proctored and available at Pearson VUE testing centers worldwide. NCSE-Core exam covers a range of topics, including Nutanix architecture and design, cluster configuration, data protection, and troubleshooting. Candidates must achieve a passing score of 300 or higher to earn the certification.

 

NEW QUESTION # 115
When using Nutanix Sizer, which solution does the Automatic sizing option provide?

  • A. The highest performance solution that meets the provided requirements
  • B. The lowest cost solution that meets the provided requirements
  • C. A solution that meets provided requirements, plus a default 25% growth capacity
  • D. A solution that balances cost and performance, plus a default 25% growth capacity

Answer: C


NEW QUESTION # 116
A large retailer company recently employed a CIO who decided that all operations should be migrated to public cloud offerings. After 7 months, the project was be a failure and determined to the CIO exited. The retailer's infrastructure consisted of tens of thousand's of VMs on thousands of hosts supported by dozen of storage arrays. Only 10% of workloads were migrated to public cloud during the CIO's tenure.
Which open ended discovery questions should the SE ask to determine pain points or gaps? (Choose two)

  • A. What challenges triggered the public cloud initiative?
  • B. Which public cloud offering(s) are utilized?
  • C. What are your end users asking for that you cannot deliver today?
  • D. Is de-duplication q requirement for your workloads?

Answer: A,C

Explanation:
* Understanding the Context:
* The project to migrate to the public cloud was largely unsuccessful, indicating underlying issues that need to be identified.
* Effective Open-Ended Questions:
* What challenges triggered the public cloud initiative?:
* Explanation: This question helps understand the initial pain points and motivations for the migration attempt, providing insight into what problems the company was trying to solve.


NEW QUESTION # 117
A prospective customer is concerned about having a single-pane-of-glass manage their infrastructure because it also provides a single-point-of-failure. How does the Nutanix Prism architecture address this concern?

  • A. Prism user Linked Mode for HA
  • B. Prism is Deployed in a 3-node HA configuration
  • C. Prism runs on every CVM
  • D. Prism is protected by RF2

Answer: C

Explanation:
* Customer Concern:
* The customer is concerned about having a single-pane-of-glass management interface being a single-point-of-failure.
* Nutanix Prism Architecture:
* Prism: The management interface for Nutanix clusters, designed to run on every Controller VM (CVM) in the cluster.
* Explanation:
* Distributed Architecture: Prism is not a single-point-of-failure because it runs on every CVM within the cluster.
* High Availability: If one CVM fails, Prism services continue to operate on the remaining CVMs, ensuring continuous management availability.
* Outcome:
* The distributed nature of Prism running on every CVM mitigates the risk of a single-point-of-failure, addressing the customer's concern effectively.
References: For more details, refer to Nutanix documentation on Prism architecture and high availability features.


NEW QUESTION # 118
A prospective customer has a requirement for Data-at-Rest-Encryption for all their data Which two license options are available to address this requirement? (Choose two)

  • A. Pro with the Encryption SKU
  • B. Ultimate
  • C. Pro
  • D. Starter with the Encryption SKU

Answer: A,C


NEW QUESTION # 119
A prospect is conducting a Nutanix POC process that will measure the time to revocer from a power loss, the impact of running multiple workloads on the same cluster, and peak storage performance. The POC results will be presented to the CIO.
How can this be achieved with the least room for error?

  • A. Use HCI Bench, manually power off the nodes during testing, and export Prism Analysis data.
  • B. Use X-Ray with the included scenarios and deliver the X-Ray PDF report.
  • C. Use iOmeter and manually power off the nodes.
  • D. Use X-Ray to generate a single workload and VDbench for the secondary workload.

Answer: B

Explanation:
* POC Requirements:
* Measure recovery time from power loss, the impact of running multiple workloads, and peak storage performance.
* The results need to be presented to the CIO.
* Tool Selection:
* X-Ray: Nutanix X-Ray is a comprehensive testing and benchmarking tool designed specifically for Nutanix environments. It includes pre-defined scenarios for various testing requirements.
* Explanation:
* X-Ray Scenarios: X-Ray comes with built-in scenarios that cover various aspects of performance, resiliency, and workload impact. This ensures that the tests are standardized and reliable.
* PDF Report: X-Ray generates detailed PDF reports that can be directly presented to stakeholders, such as the CIO, providing a clear and professional summary of the test results.
* Outcome:
* Using X-Ray with its included scenarios will provide the most reliable and comprehensive testing environment, reducing the room for error and ensuring the results are presented in a professional format.
References: Refer to Nutanix documentation on X-Ray and its usage for performance testing and benchmarking.


NEW QUESTION # 120
An existing customer wants to upgrade their non-AHV hypervisor to the most recent version. The customer needs confirm that the hypervisor is supported on their AOS version. Where on the Support Portal is this information located?

  • A. Compatibility Matrix
  • B. EOL, Information
  • C. Upgrade Paths
  • D. Field Advisories

Answer: A


NEW QUESTION # 121
A customer has deployed Nutanix with Esxi for VDI workloads and is considering Nutanix for a major server virtualization project. The customer is running z/Virtual Machine today for a mission critical workload and would like to consider Nutanix as a potential platform.
Which reason would currently disqualify this prospect as an opportunity?

  • A. There is no assurance of project progression yet.
  • B. Nutanix does not support z/OS or z/VM
  • C. New hardware will be announced next quarter.
  • D. Accurate sizing information is not available

Answer: D


NEW QUESTION # 122
An SE is working to size a prospects environment that includes production Oracle databases.
Which Oracle output should the SE request from the prospect to collect accurate sizing information?

  • A. STATSPACK
  • B. Oracle Export Schema
  • C. Active Session History Report
  • D. Automatic Workload Repository Report

Answer: D

Explanation:
D:Automatic Workload Repository Report:
* The Automatic Workload Repository (AWR) report provides comprehensive details about Oracle database performance, workload characteristics, and resource utilization. This report is crucial for accurately sizing an environment that includes production Oracle databases.
* AWR reports contain historical data on system performance and are used to identify trends, workload patterns, and potential bottlenecks. This information is essential for determining the appropriate resources needed to support the Oracle databases in the Nutanix environment.
References:
* Nutanix documentation and Oracle best practices for database sizing recommend using AWR reports for accurate performance and capacity planning.


NEW QUESTION # 123
Refer to Exhibit.

When entering a Raw Input workload into Sizer, what amount of RAM should be used for the entire workload?

  • A. 32GB
  • B. 48GB
  • C. 64GB
  • D. 42GB

Answer: A


NEW QUESTION # 124
What are two things that the ADS service does for VMs within AHV? (Choose two.)

  • A. Invoke workload movement if there is contention of resources.
  • B. Balance VMs throughout the Cluster when the VM is first powered on
  • C. Re-balance powered-on VMs evenly throughout the cluster
  • D. Invoke workload movement when there is no contention of resource

Answer: A,B

Explanation:
The ADS (Acropolis Dynamic Scheduler) service in AHV performs the following tasks for VMs:
* Invokes workload movement if there is contention of resources: ADS dynamically reallocates resources to balance the load and prevent resource contention.
* Balances VMs throughout the cluster when the VM is first powered on: ADS ensures that VMs are optimally placed based on available resources and load distribution when they are started.


NEW QUESTION # 125
An administrator receive report that VDI desktop performance in an 8-node Nutanix VDI environment is poor.
Opening applications takes between 1 and 2 minutes. When investigating the issue, the following conditions are found:
* Cluster memory utilization: 80%
* Cluster SSD utilization: 70%
* Average VM CPU wait time: 11 %
* CVM CPU utilization: 75%
Which action should be taken to improve VDI performance?

  • A. Ad memory to the nodes in the cluster
  • B. Increase the amount of SSD storage in the cluster
  • C. Add CPU resources to the cluster
  • D. Increase the number of vCPU cores allocated to the CVM

Answer: A


NEW QUESTION # 126
An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.
Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?

  • A. 24 TB
  • B. 15 TB.
  • C. 37 TB
  • D. 39 TB

Answer: C

Explanation:
* Understanding RVTools Output:
* RVTools provides detailed information on the storage usage of virtual machines, including provisioned, used, and free space.
* Determining Storage Requirements:
* Aggregate Workload Sizing: The SE must consider the total storage requirements, including current usage and future growth, to ensure the Nutanix Cluster can handle the workload.
* Value Selection:
* 15 TB: Likely insufficient for a sizable environment.
* 24 TB: More significant but may still be insufficient for larger deployments.
* 37 TB: Appears to be a reasonable estimate for a substantial workload, considering both current usage and future growth.
* 39 TB: Very close but slightly overestimated compared to typical recommendations.
* Conclusion:
* The most accurate representation of the minimum required storage capacity for the aggregate workload in sizer is37 TB.
References:
* Nutanix Sizing Guidelines.
* RVTools Documentation.


NEW QUESTION # 127
A custormer's database administrator is concerned about restoring data locality for their VMs after they migrate during an AHV upgrade. Which feature that addresses the issue should the systems engineer highlight? (Choose Two)

  • A. Shadow clones mitigate the need for data locality.
  • B. All VM data is moved from the source to the destination node with the VM.
  • C. AHV's built-in scheduler automatically restores data locality
  • D. Mirroring the database on two VMs eliminates the need for data locality

Answer: B,C


NEW QUESTION # 128
What information can be gathered about the configuration of the VM storage?

  • A. VMs have may disks
  • B. Total disk usage is high
  • C. Majority or VMs are Thin Provisioned
  • D. Storage capacity is a problem

Answer: B


NEW QUESTION # 129
A systems engineer is sizing a configuration for a cluster that needs to tolerate up to 2 simultaneous disk failures across different nodes. What is the minimum number of nodes required?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 130
......

NCSE-Core Dumps for success in Actual Exam: https://examboost.latestcram.com/NCSE-Core-exam-cram-questions.html