SAP C-TS420-1809 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Master Data in Manufacturing | 12% - 16% | - Manufacturing Master Data
|
| Topic 2: Production Orders | 12% - 16% | - Order Processing
|
| Topic 3: Demand Management | 8% - 12% | - Demand Planning
|
| Topic 4: Monitoring and Analytics | < 8% | - SAP Fiori and Reporting
|
| Topic 5: Process Orders | 8% - 12% | - Process Manufacturing
|
| Topic 6: Production Planning Integration | 8% - 12% | - Cross-Functional Integration
|
| Topic 7: Material Requirements Planning | 12% - 16% | - MRP Procedures
|
| Topic 8: Capacity Planning | 8% - 12% | - Capacity Management
|
| Topic 9: Lean Manufacturing | 8% - 12% | - Repetitive Manufacturing
|
C-TS420-1809 Exam Questions Answered
If you are purchasing for a company, take all three versions of SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809), since different employees study differently. If you are buying for yourself, pick the single version that matches your habits: the PDF for printing and writing on paper, the PC test engine for simulation tests with scored feedback, or the APP online engine for cross-platform use with offline support.
C-TS420-1809 requires 60% to pass, and the official exam fee is USD 550. Remember that a retake means paying that fee again, which is why focused preparation matters.
The C-TS420-1809 exam contains 80 questions within 180 minutes minutes. Rehearsing under the same limit on the LatestCram engine builds calm, automatic pacing.
IT certification exams are not cheap, and failing usually means paying the full fee a second time plus losing the hours you already invested. Serious preparation with SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) exists precisely to prevent that double cost: study the 95 verified questions well, and you give yourself a strong, realistic chance of passing the C-TS420-1809 exam the first time.
The package includes 95 practice questions for the C-TS420-1809 exam, all with verified answers, in PDF, PC test engine, and APP online engine versions.
No mandatory prerequisite certification. SAP recommends practical project experience and training in SAP S/4HANA Production Planning and Manufacturing.
- Capacity Planning (8% - 12%)
- Demand Management (8% - 12%)
- Process Orders (8% - 12%)
Spend your hours where the weights are highest.
SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) Sample Questions:
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
- A. Finite resource and finite strategy
- B. Infinite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and infinite strategy
Correct Answer: A 🗳️
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Planning horizon
- B. Parallel processing across servers
- C. Net change planning
- D. MRP list
Correct Answer: C 🗳️
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Setting a planning time fence in the Material Master Record
- B. Creating a planned order within the planning time fence
- C. Manually changing the quantity of a planned order
- D. Assigning a production scheduling profile
Correct Answer: A,B 🗳️
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Storage Location MRP Indicator
- B. Mixed MRP indicator
- C. Individual/Collective Indicator
- D. Dependent Requirements indicator
Correct Answer: B 🗳️
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
- A. They can be applied to make-to-stock production order.
- B. They can be used for manufacturing with collective orders.
- C. They can be used for repetitive manufacturing.
- D. They can be created automatically during month end process.
Correct Answer: A,C 🗳️